Tualatin, OR
- 8215 SW Tualatin-Sherwood Rd Suite 200, Office 13
Tualatin, OR 97062 - (503) 689-5705
- View on Google Maps
Limited time: free Sherwin-Williams paint upgrade. $0 down, 0% interest for up to 21 months, on approved credit. Ask us for details.

Gresham's homes run from postwar ranch houses in Rockwood and Centennial to homes built during the city's 1970s and 1980s boom. Our own crew preps and paints them all, and every estimate is free.
(503) 689-5705Served by our Tualatin office. Free estimates and a 5-year workmanship warranty.

Two quick steps. No obligation.
We'll reach out to set up your free estimate. Want to talk now? Call (503) 689-5705.
Prefer to talk? Call (503) 689-5705Licensed, bonded & insured5-year warrantyFamily-owned since 2009

House painting in Gresham
Painting a house in Gresham usually means working with siding and trim that have been through decades of wet winters. Much of the city went up in two waves: the postwar years, when farmland in Rockwood and Centennial gave way to subdivisions, and the boom years of the 1970s and 1980s. Johnson Creek runs west through town, and hills rise along the eastern edge, close to the mouth of the Columbia River Gorge.
Our own crew does the work, not day crews or subcontractors, and Gresham is served by our Tualatin office. Older siding needs careful prep, and ours includes a professional soft wash, then patching, sanding, scraping and priming before any paint is applied, with caulking and back-rolling on the exterior. Floors, furniture, windows and plants are covered while we work, and at the final walkthrough, if anything needs a touch-up, we handle it on the spot.
Gresham homes
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates
Census estimates from the 2020 to 2024 American Community Survey put Gresham's median year built at 1981. 48% of homes were built before 1980, 31% between 1980 and 1999, and 21% in 2000 or later. 56% are owner-occupied.
That age shows on the outside of the house. Expect scraping where old coats have lifted, primer on bare wood, and fresh caulk where joints have opened up over the years. The 31% from the 1980s and 1990s have usually been repainted before, so the question is how well the last coat was prepped. Homes built before 1978 can have lead-based paint, and with 48% of Gresham's homes built before 1980, it's worth asking about; we're lead-safe certified (lead-based paint renovation license LBPR197703). Homes from 2000 on are usually ready for a first or second full repaint, and some sit in subdivisions with HOA color rules, so check yours before you choose. For the rentals among Gresham's 44,005 housing units, we also handle unit turnovers and exterior repaints for landlords.

Weather and timing
NOAA's 1991 to 2020 normals for the Portland Troutdale Airport station, about 3.8 miles from Gresham, show 40.7 inches of precipitation a year and measurable precipitation on 159.4 days. The summer break is short but dependable: July averages 0.6 inches and August 0.6, then September jumps to 1.8.
That's why exterior work bunches up in summer and early fall. Our exterior season typically runs April through mid-November, and our exterior Sherwin-Williams lines can go on down to 35°F with a dry surface at least 5° above the dew point and no rain expected for a few hours. In colder or wetter weather we may use Sherwin-Williams Resilience or Latitude. If you want a July or August start, ask for your estimate in spring.
More in our guide to when to paint your house exterior.
Before you paint
Where we work
Gresham has 16 recognized neighborhood associations, and we serve all of them, including:
Neighborhood names: City of Gresham
FAQ
Yes. We serve every part of Gresham, from Rockwood, Centennial and Wilkes East to Powell Valley, Kelly Creek and Gresham Butte. The work is done by our own in-house crew, trained in-house and checked by our own supervisors, and most of the crew have been with us 5 to 15 years. Your free estimate comes with a written scope listing colors, products, prep and timing.
Most exterior projects take about 2 to 3 days, depending on size, condition and weather. Your written scope includes timing, so you know the plan before work starts. Prep is part of that time: a soft wash, then patching, sanding, scraping and priming before any paint is applied. If the house needs dry rot repair, that's planned in as well.
Yes. Our interior Sherwin-Williams lines need temperatures above 50°F, which a heated home provides, so interior work isn't tied to the dry season the way exterior work is. We paint walls, ceilings, trim, doors and cabinets, and we cover floors, furniture and windows before we start. Exterior painting typically runs April through mid-November.

Tell us what you're painting and we'll set up a time to see it. Ask about the free Sherwin-Williams upgrade and $0-down financing while you're at it.
Backed by our 5-year workmanship warranty.