Vancouver, WA
- 11700 NE 95th St Ste 171
Vancouver, WA 98682 - (360) 607-3434
- View on Google Maps
Limited time: free Sherwin-Williams paint upgrade. $0 down, 0% interest for up to 21 months, on approved credit. Ask us for details.

Longview was built as a planned city in the 1920s, and many of its homes are close to a century old. Our own crew brings the prep older houses need, starting with a free estimate.
(360) 607-3434Served by our Vancouver office. Free estimates and a 5-year workmanship warranty.

Two quick steps. No obligation.
We'll reach out to set up your free estimate. Want to talk now? Call (360) 607-3434.
Prefer to talk? Call (360) 607-3434Licensed, bonded & insured5-year warrantyFamily-owned since 2009

House painting in Longview
Longview is unusual: the Long-Bell Lumber Company planned and built it in the early 1920s, with boulevards radiating from a central civic center. Its first building boom, from 1923 to 1934, produced Tudor and craftsman homes, and suburban developments added neighborhoods in the western valley in the 1960s. Many older houses here have original wood siding, deep trim and porches under many layers of paint, so careful prep matters.
Longview and neighboring Kelso are covered by our Vancouver office. Final Touch Painting is family-owned, founded in 2009, and has painted 3,000+ homes with its own in-house crew, never day crews or subcontractors. Most of our painters have been with us 5 to 15 years. We paint exteriors, interiors and cabinets, and our two in-house carpenters handle dry rot repair.
Longview homes
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates
Most of Longview's homes are older than 1980: Census estimates for 2020 to 2024 put that share at 74% of the city's 16,826 housing units, with 17% built in 1939 or earlier and a median year built of 1967. Another 18% date from 1980 to 1999, and just 8% were built in 2000 or later, with 2% in 2010 or later. Owners occupy 55% of homes, so many are rentals, and we paint those too.
On houses this age, the old paint is part of the job. Homes built before 1978 can have lead-based paint, which in Longview covers most of the housing. Final Touch Painting is lead-safe certified, with lead-based paint renovation license LBPR197703. Expect thorough prep: we patch, sand, scrape and prime before any paint is applied, caulk open joints, and check sills, trim and lower siding for dry rot, which our in-house carpenters cut out and replace before we prime and paint.

Weather and timing
Source: NOAA NCEI U.S. Climate Normals, 1991-2020: Longview station, about 1.4 miles from the city center
Wet days are the rule in Longview. NOAA's 1991 to 2020 climate normals for the Longview station, about 1.4 miles from the city center, average 48.1 inches of precipitation a year, with measurable precipitation on 192.1 days. July averages 0.6 inches, August 1.0 inch and September 2.3 inches, so the dry window is mostly July and August.
Fall fog can hang on here, and on cool mornings siding may not be dry, or far enough above the dew point, until later in the day. Our exterior Sherwin-Williams lines need a dry surface at least 5° above the dew point, 35°F or warmer, and no rain expected for a few hours. The exterior season typically runs April through mid-November, and in colder or wetter weather we may use Sherwin-Williams Resilience or Latitude.
More in our guide to when to paint your house exterior.
Before you paint
Where we work
The City of Longview's housing plan names these neighborhoods, all served by our Vancouver office:
Neighborhood names: City of Longview, Comprehensive Plan Housing Element (2006)
FAQ
If it was built before 1978, it can have lead-based paint, and Census estimates put 74% of Longview's homes before 1980. Final Touch Painting is lead-safe certified under lead-based paint renovation license LBPR197703. Tell us your home's age when you book your free estimate, so the written scope can cover lead-safe prep.
Yes. Our Vancouver office serves all of Longview, from the Old West Side, St. Helens and Highlands to the newer neighborhoods in the western valley. Older homes there usually need more scraping, priming and a dry rot check, and our in-house carpenters repair rotted wood before we prime and paint.
Most exterior projects take about 2 to 3 days, depending on the size of the house, its condition and the weather. In Longview, older homes that need more prep, or foggy fall mornings that keep siding damp, can stretch that, so allow some flexibility. Your written scope spells out the prep and timing before work starts.

Tell us what you're painting and we'll set up a time to see it. Ask about the free Sherwin-Williams upgrade and $0-down financing while you're at it.
Backed by our 5-year workmanship warranty.