Camas, WA
- 2005 SE 192nd Ave Ste 200
Camas, WA 98607 - (360) 835-6408
- View on Google Maps
Limited time: free Sherwin-Williams paint upgrade. $0 down, 0% interest for up to 21 months, on approved credit. Ask us for details.

Washougal homes deal with fog off the Columbia and cold east winds from the Gorge. Our own crew plans prep and timing around both, and a free estimate gets you a written price.
(360) 835-6408Served by our Camas office. Free estimates and a 5-year workmanship warranty.

Two quick steps. No obligation.
We'll reach out to set up your free estimate. Want to talk now? Call (360) 835-6408.
Prefer to talk? Call (360) 835-6408Licensed, bonded & insured5-year warrantyFamily-owned since 2009

House painting in Washougal
Washougal runs from diked lowland along the Columbia River up onto the slopes north of the Washougal River, where homes look out over the river and the Gorge. Single-family neighborhoods spread north from the downtown core, getting less dense as they climb. Older houses near downtown often need heavy prep on aging wood, while newer subdivisions farther up are often due for a first or second repaint.
Washougal is served by our Camas office. Final Touch Painting has been family-owned since 2009 and has painted 3,000+ homes. The work is done by our own in-house crew, not day crews or subcontractors, and most of the crew has been with us 5 to 15 years. We paint siding, trim, fascia, soffits, doors, garage doors, gutters and fences, plus interiors and cabinets, and our in-house carpenters repair dry rot.
Washougal homes
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates
Washougal's housing is younger than Vancouver's but older than Camas's. The U.S. Census Bureau's 2020 to 2024 estimates give a median year built of 1999 for its 6,342 housing units. A third, 33%, were built before 1980, including 8% in 1939 or earlier. Another 19% date from 1980 to 1999, and 48% were built in 2000 or later, with 20% in 2010 or later. Owners occupy 71% of homes.
For painting, that splits the city in two. Pre-1980 houses tend to have wood siding and trim under many coats of paint, so they need more scraping and priming and a dry rot check around windows, doors and the lower siding. Any home built before 1978 can have lead-based paint; we're lead-safe certified, with lead-based paint renovation license LBPR197703. The newer half of the city is mostly reaching its first or second repaint, where caulk, trim and sun-faded siding on the south and west walls need the most attention.

Weather and timing
Rain is the main scheduling factor in Washougal. NOAA's 1991 to 2020 climate normals for the Washougal 3.7 NNW station, about 3.3 miles from town, average 58.8 inches of precipitation a year. Summer is the break: July averages 0.7 inches and August 0.8 inches, then September rises to 2.4 inches.
That makes July and August the dependable months for exterior work, inside a season that typically runs April through mid-November. Fog is common along the river, and damp siding has to dry before painting: our exterior Sherwin-Williams lines go on down to 35°F, but only on a dry surface at least 5° above the dew point, with no rain expected for a few hours. When it's colder or wetter, we may use Sherwin-Williams Resilience or Latitude.
More in our guide to when to paint your house exterior.
Before you paint
Where we work
Areas of Washougal named in the City's comprehensive plan include:
Neighborhood names: City of Washougal, 2015 to 2035 Comprehensive Plan
FAQ
Only if your house is inside the National Scenic Area and was built after 1986. In that case, the Columbia River Gorge Commission says the new exterior color must be approved by your county planning department. The City's plan places the Scenic Area along the east edge of Washougal's growth area, so this mainly affects homes east of town. Check before you pick colors.
Mostly by wearing on the house between paint jobs. Wind-driven rain gets behind cracked caulk and lifting paint, so prep matters here: we patch, sand, scrape and prime before any paint is applied, then caulk and back-roll on exteriors. For exposed walls, ask about Emerald Exterior, which resists blistering, peeling, fading and dirt pickup in fewer coats.
Often, yes. Exterior season typically runs April through mid-November, and our exterior Sherwin-Williams lines can go on down to 35°F on a dry surface at least 5° above the dew point, with no rain expected for a few hours. Fall fog and rain shorten the list of workable days, and in colder or wetter weather we may use Resilience or Latitude.

Tell us what you're painting and we'll set up a time to see it. Ask about the free Sherwin-Williams upgrade and $0-down financing while you're at it.
Backed by our 5-year workmanship warranty.